Key Findings
  • Global AI spending is projected to reach US$2.52 trillion in 2026[2], yet a BCG survey shows that while 75% of enterprises rank AI among their top three priorities, only 25% have actually realized value[3] — the precision of budget planning directly determines project success or failure
  • Within the AI project cost structure, data preparation accounts for 30-40%, model development 20-25%, integration and deployment 15-20%, and ongoing operations 15-20% — most enterprises severely underestimate the share of data preparation and operations, which is the primary cause of budget overruns
  • An MIT Technology Review survey found that in Q3 2023, 79% of enterprises planned to deploy GenAI within one year, but by May 2024, only 5% had actually entered production[5] — the cost gap from PoC to Production far exceeds expectations
  • Taiwan's Executive Yuan has committed NT$190 billion to ten major AI infrastructure projects from 2025 to 2028[14]. Combined with SBIR, SIIR, and other subsidy programs, enterprises can offset 30-50% of upfront AI project costs

1. The Global Scale of AI Investment and Taiwan's Position

Before discussing specific costs, it is important to understand the global trends in AI investment — this is not merely a technology issue, but a matter of enterprise survival.

Gartner forecasts that global AI spending will reach US$2.52 trillion in 2026, a year-over-year increase of 44%[2]. Generative AI spending alone reached US$644 billion in 2025, up 76.4% from 2024[12]. The McKinsey Global Institute estimates that generative AI could add US$2.6 to US$4.4 trillion in value to the global economy annually[1], with 75% of that value concentrated in four domains: customer operations, marketing and sales, software engineering, and R&D.

Stanford HAI's AI Index 2025 report[7] provides more granular investment data: total global enterprise AI investment reached US$252.3 billion in 2024, with private investment growing 44.5% year-over-year and generative AI attracting US$33.9 billion. Notably, inference costs for GPT-3.5-class systems dropped 280-fold in just two years — meaning the same AI capabilities are now far less expensive to deploy.

McKinsey's early 2025 survey[9] reveals that 92% of enterprises plan to increase AI investment over the next three years, yet only 1% of leaders consider their organization "mature" in AI deployment. 47% of executives believe their company is moving too slowly on AI. This pattern of "heavy investment with limited results" stems in part from cognitive bias in cost structure — enterprises allocate too much budget to the "tip of the iceberg" of model development while overlooking the larger hidden costs beneath the surface.

In Taiwan, the Executive Yuan launched ten major AI infrastructure projects in 2025, committing NT$190 billion from 2025 to 2028[14], spanning silicon photonics, quantum technology, AI robotics, and more. Combined with existing SBIR, SIIR, and CITD subsidy programs, Taiwanese enterprises can receive significant government support for upfront AI project investment.

2. The Four Major Cost Components of AI Projects

BCG's "10-20-70 framework"[3] states that only 10% of AI value realization comes from algorithms, 20% from data and technology, and 70% from people, processes, and cultural transformation. This ratio applies equally to costs — yet most enterprises allocate their budgets in the opposite direction, pouring the majority of resources into technology development while underinvesting in process transformation.

2.1 Data Preparation (30-40% of Total Cost)

Deloitte's seventh edition State of AI in the Enterprise survey[4] reveals a sobering reality: the percentage of respondents who consider their organization's data management "well-prepared" dropped sharply from the prior year's high to just 40%, while technology infrastructure readiness fell to 43%. The largest cost black hole in AI projects is often not the model itself, but the data.

Specific cost items in data preparation include:

2.2 Model Development (20-25% of Total Cost)

This is the component most enterprises "assume" is the largest share, but it actually accounts for a relatively smaller portion:

2.3 Integration and Deployment (15-20% of Total Cost)

The MIT Technology Review survey[5] clearly illustrates the "deployment gap": 60% of enterprises are evaluating AI tools, 20% have reached the pilot stage, but only 5% have entered production. The costs of transitioning from PoC to Production include:

2.4 Ongoing Operations (15-20% of Total Cost, Annualized)

This is the most commonly overlooked component, yet it may represent the largest long-term cost:

3. Cost Ranges Across the PoC, MVP, and Production Stages

The following cost ranges are based on Taiwan-market AI project benchmarks, segmented into three tiers by enterprise scale and use-case complexity:

3.1 Proof of Concept (PoC) — 4 to 12 Weeks

ItemSmall (Simple Use Case)Medium (Standard Use Case)Large (Complex Use Case)
ScopeSingle model, small sampleMulti-model comparison, moderate dataMulti-model, large-scale data, compliance
Timeline4-6 weeks6-8 weeks8-12 weeks
Cost RangeNT$300K-800KNT$800K-2MNT$2M-5M
Typical ScenariosDocument classification, simple predictionIntelligent customer service, quality predictionRisk control models, multimodal analysis

The core purpose of a PoC is not to deliver a perfect system, but to validate three things: technical feasibility (can this problem be solved with AI?), data availability (is your data quality sufficient?), and business value (does the expected benefit justify the investment?). Research by the RAND Corporation[6] indicates that 80% of AI project failures can be traced back to poorly defined problem statements — the PoC phase is the critical window for clarifying the problem.

3.2 Minimum Viable Product (MVP) — 3 to 6 Months

ItemSmallMediumLarge
ScopeSingle module live, limited usersMultiple modules, department-level deploymentEnterprise-level system, cross-department integration
Timeline3-4 months4-5 months5-6 months
Cost RangeNT$1M-3MNT$3M-8MNT$8M-20M
IncludesModel + API + basic UIModel + integration + monitoring + UIFull stack + compliance + training

3.3 Production Launch and Operations — Ongoing Investment

ItemSmallMediumLarge
One-time launch costNT$500K-1.5MNT$1.5M-5MNT$5M-15M
Annualized operations costNT$300K-800K/yearNT$800K-2.5M/yearNT$2.5M-8M/year
IncludesBasic monitoring + quarterly retrainingFull MLOps + monthly retrainingDedicated ops team + continuous optimization

MIT Technology Review data[5] shows that average enterprise monthly spending on AI-native applications reached US$85,521 (approximately NT$2.7M/month) in 2025, a 36% increase over 2024. The share of enterprises planning to invest over US$100,000/month doubled from 20% to 45%. These figures reflect spending levels at large global enterprises; Taiwanese mid-sized companies typically spend one-fifth to one-third of these amounts.

4. Five Hidden Costs: The Real Culprits Behind Budget Overruns

RAND Corporation research[6] finds that the failure rate for AI projects exceeds 80% — twice that of non-AI IT projects. Budget overruns are a major driver of failure, and hidden costs are the primary cause of overruns.

4.1 The Iceberg Effect of Data Cleaning

When budgeting, enterprises typically account only for the data they "need" and overlook the data's "actual state." In real-world scenarios, the data cleaning workload is often 2-3 times what was anticipated: inconsistent data formats (different date formats exported from different systems), higher-than-expected missing value rates, poor labeling quality in historical data, and inconsistent join keys across departmental databases. We recommend reserving an additional 30-50% buffer for data cleaning in the budget.

4.2 Organizational Change Management Costs

HBR's analysis[13] points out that the core reason AI adoption stalls is not the technology, but employee anxiety about their roles, identity, and job security. In BCG's 10-20-70 framework[3], 70% of value comes from people and processes — which also means 70% of the challenges lie there. Change management costs include:

4.3 Opportunity Costs and Internal Headcount Investment

AI projects require substantial time investment from business units — requirements definition, data provisioning, outcome validation, and user testing. These time investments are rarely included in formal budgets, but they represent real opportunity costs for business departments. McKinsey's survey[9] shows that the rate at which employees use AI in their daily work is three times what leaders expect — meaning that once an AI project launches, internal attention and resource commitments will far exceed projections.

4.4 Iteration and Scope Creep

The exploratory nature of AI projects makes scope creep more common than in traditional software projects. New opportunities discovered during the PoC phase, new requirements surfacing from user testing, and technical limitations necessitating solution adjustments can all lead to budget additions. We recommend reserving a 20-30% "iteration buffer" in the initial budget.

4.5 Vendor Switching Costs

If the first vendor fails to deliver satisfactory results, the cost of switching vendors extends beyond simply "paying for development again." It also includes: the new vendor's learning curve, data and model migration work, and the effort to rebuild team confidence. This is precisely why careful selection of your AI outsourcing vendor is the first line of defense in budget management.

5. Government Subsidy Offsets: A Cost Advantage for Taiwanese Enterprises

Taiwan's Executive Yuan launched ten major AI infrastructure projects in 2025[14]. Combined with multiple existing subsidy programs, enterprises enjoy significant cost offsets for AI investments:

Subsidy ProgramMaximum AmountEligible ApplicantsAI Relevance
SBIR Phase 2NT$10MSMEsAI technology R&D projects
SIIRNT$10MService industriesAI service innovation
CITDNT$10MManufacturingAI smart manufacturing
Smart Operations Efficiency ProgramSubject to reviewAll industriesAI adoption guidance

Take a medium-sized AI project as an example (total budget NT$5M): if the enterprise successfully secures an SBIR Phase 2 grant of NT$2M (a 40% subsidy rate) and applies Taiwan's corporate income tax R&D investment credit (up to 25%), the actual out-of-pocket cost can drop to NT$2.25-2.75M — nearly half the original budget.

For detailed application strategies for additional subsidy programs, see our Complete Guide to AI Subsidies.

6. The ROI Model: How to Convince Your CFO

A recent HBR CEO roundtable[11] conducted an in-depth discussion on measuring AI ROI. Unlike traditional IT investments, the ROI of AI projects must be calculated along two dimensions simultaneously: "cost avoidance" and "revenue growth."

6.1 Cost Avoidance ROI

The easiest dimension to quantify — and the easiest to use when convincing the CFO:

6.2 Revenue Growth ROI

Harder to quantify but with greater long-term value:

6.3 ROI Calculation Framework

We recommend a three-year NPV (Net Present Value) model:

Year One: High investment, low returns. PoC + MVP + launch, primarily a cost expenditure period. Expected returns equal roughly 10-20% of total investment (mainly from quick-win automation scenarios).

Year Two: Benefits begin to materialize. The system is running stably, user proficiency has improved, and expansion to additional use cases begins. Expected cumulative returns reach 80-150% of total investment.

Year Three: Economies of scale. AI capabilities are embedded in core processes, and continuous optimization delivers marginal gains. Expected cumulative returns reach 200-400% of total investment.

BCG's survey[3] shows that 60% of enterprises lack clear AI financial KPIs — this is the primary reason CFOs remain cautious about AI investments. Providing a clear, quantifiable ROI model with defined milestones is the key to securing investment approval.

7. Practical Recommendations for Budget Planning

Forrester predicts[10] that enterprises will defer 25% of planned AI spending from 2026 to 2027 — reflecting widespread uncertainty in AI budget planning. The following recommendations are based on hands-on project experience:

7.1 Invest in Phases — Avoid Large Lump-Sum Commitments

We recommend adopting a "Stage-Gate" model: evaluate outcomes at the end of each phase before deciding whether to invest in the next. PoC-phase investment typically accounts for 10-15% of the total budget, but it can validate technical feasibility and data readiness early on, preventing overinvestment in the wrong direction.

7.2 Reserve Ample Budget for Data Preparation

According to Deloitte's survey[4], data management readiness continues to decline, meaning most enterprises' data is in worse shape than they realize. We recommend that the data preparation budget account for at least 35% of the total. If an organization has never undertaken systematic data governance, this proportion should increase to 40-45%.

7.3 Operations Budgets Should Cover at Least Two Years

AI systems are not "build it and forget it" one-time projects. Model performance degrades as data distributions shift, requiring ongoing monitoring and retraining. We recommend budgeting at least two years of operational expenses alongside the project budget, typically at 20-30% of the initial development cost per year.

7.4 Include Change Management Costs

Do not allocate the entire budget to technology — BCG's research[3] repeatedly emphasizes that 70% of AI value comes from people and processes. We recommend allocating 10-15% of the total budget to training, process redesign, and change communication.

7.5 Leverage Government Subsidies to Reduce Risk

Taiwan's AI-related subsidy programs[14] represent one of the few institutional frameworks globally that can significantly reduce enterprise AI investment risk. Incorporating subsidy applications into the project timeline from the planning stage can effectively lower upfront costs by 30-50%.

8. Conclusion: Precise Budgeting Is the First Step to Successful AI Deployment

Global AI spending will exceed US$2.5 trillion in 2026[2], yet Deloitte's survey[4] shows that while 74% of enterprises expect AI to drive revenue growth, only 20% have achieved this goal. A core reason for the gap is cognitive bias in budget structure — overinvesting in technology development, neglecting data preparation, underestimating operations costs, and overlooking change management.

The core message of this article can be distilled into a single formula: Total AI Project Cost = Data Preparation (35%) + Model Development (20%) + Integration & Deployment (18%) + Ongoing Operations (17%) + Change Management (10%). Any budget plan that significantly deviates from these proportions warrants re-examination.

At Meta Intelligence, we help enterprises build precise cost models from the project planning stage — including identifying common AI adoption pitfalls, designing phased investment strategies, and maximizing government subsidy offsets. Whether your AI project budget is NT$500K or NT$50M, the right budget structure is the first step to successful deployment.